Primary site analysis includes steps such as the following:

  • Analysing the traffic volume
  • Estimating the customer potential
  • Determining vehicle approval data
  • Reviewing the existing charging infrastructure

Secondary site analysis includes steps such as the following:

  • Connection to the mains
  • Load management analysis
  • Parking lot design
  • Routing cables
  • Use of PV energy
  • Employee parking lots
  • Charging management for company and fleet vehicles

Reference project

Green Factory

The Alois Müller Group relies on sustainable solutions in the area of mobility, too. The premises in Ungerhausen have a total of eight charging points for electric vehicles. These can be used by anyone at no cost. Two of them are fast chargers, which recharge the battery of an electric vehicle within 20 minutes at up to 150 kW. The charging stations get their energy from our own photovoltaic system – which means they are CO2-neutral in two respects. The electric charging station is in the immediate vicinity of the A96 motorway, which makes it attractive for all electric car drivers travelling on the motorway between Munich and Lindau.

Normal charging station

e-con

Our first reference project is located in front of our corporate headquarters in Memmingen, Germany:
Thanks to the rooftop PV system, you can charge up in CO2-neutral fashion.

The normal charging station has a total output of 4 kW.

Additional information:

  • 2-in-1 charging station 2x Type2 22 kW AC (female connector)
  • 2 charging points for simultaneously charging 2 electric vehicles
  • Connection to the ChargeIT Mobility backend system
  • Automatic billing of charging operations via the backend system
  • Enable signal via RFID and SMS & Charge possible
  • Automatic networking with navigation systems and Internet platforms
  • Connection to the three largest E-Roaming platforms (intercharge, e-clearing.net and Gireve)
  • Charging units available 24/7

Fast charging station

Allgäu Airport

2 fast charging stations (high-voltage) with a total output of 215 kW each
1x 4-in-1 charging station with 2x CCS Type2 150 kW DC, 1x Type2 22 kW AC (female connector), 1x Type2 43 kW AC male connector
1x 6-in-1 charging station with additional Tesla & CHAdeMo male connectors up to 50 KW DC each
10 charging points for simultaneous charging of 8 electric vehicles
Connection to the ChargeIT Mobility backend system
Automatic billing of the charging operations via the backend system
Enable via RFID and SMS & Charge possible
Automatic networking with navigation systems and Internet platforms
Connection to the three largest eRoaming platforms (intercharge, e-clearing.net and Gireve)
Charging units available 24/7

Charging stations supplied with “green electricity” thanks to PV plants.

Plug & play charging box

Hotel Alte Post Mindelheim

Normal charging station with a total output of 44 kW
1x 2-in-1 charging station 2x Type2 22 kW AC (female connector)
2 charging points for simultaneously charging 2 e-vehicles
Connection to the ChargeIT Mobility backend system
Automatic billing of the charging operations via the backend system
Enable via RFID and SMS & Charge possible
Automatic networking with navigation systems and Internet platforms
Connection to the three largest eRoaming platforms (intercharge, e-clearing.net and Gireve)
Charging units available 24/7

Charging stations are supplied with green electricity.