New development area “Neue Priel”
Living close to the city in a prime location in modern new buildings with low operating costs thanks to district heating: We implemented the energy concept…
Living close to the city in a prime location in modern new buildings with low operating costs thanks to district heating: We implemented the energy concept…
The local heating network in Memmingen’s industrial area Memmingen Nord is being further expanded. The three-story Fraunhofer Palais commercial building is connected to the local heating…
The network planning for the Winterried local heating network as well as the planning of the energy center was carried out by e-con AG, the execution…
For the field heating of a rhubarb field of Energiehof Thanner GmbH & Co. KG, the existing CHP plant was expanded by another newly installed CHP…
The local heating network in Memmingen’s industrial area Memmingen Nord is being further expanded. Renewable energies are playing an increasingly important role in the construction of…
In the district of Dickenreishausen in Memmingen, a district heating network is currently being built for the new development area with 33 house connections. There are…
Building services engineering planning for the new B6 administrative building of the Grob Werke in Mindelheim. With a total of 23,000 m².
The local heating network has a sustainable model for central energy generation. It ensures maximum efficiency and flexibility for taking into account future innovations.
For this project, we use the power of opposites in our system concept. This is what distinguishes the control and automation level of the CCHP system…
We have been commissioned by the Autohaus Reisacher Group to perform nearly all of the technical finishing trades in the 36,000 square-metre dealership, one of the…