Dickenreishausen local heating network

Visit to Ziegelstadel – Connections also for existing buildings At the appointment in Dickenreishausen: (from left) Theodor Pieper (municipal construction manager), Peter Waizenegger (board member of e-con AG), Andreas Müller ( CEO of Alois Müller GmbH), Lord Mayor Manfred Schilder, Manfred Sommer (construction manager of e-con AG), Hans Martin Geiger and Manfred Honold (Bioenergie Dickenreishausen…

Ladestation Mindelheim

New charging column for electric cars in Mindelheim

Expansion of the e-mobility infrastructure in the Allgäu by e-con is progressing – this time in Mindelheim. This means we now have a total of six publicly accessible charging stations in the Allgäu region. Our newest electric charging column in Mindelheim is located right by the family-run 3-star superior hotel called “Alte Post” in Mindelheim.…

Local heating network in Neue Priel, Amendingen

Starting in 2019, family-friendly single-family homes have been getting built adjacent to a growing residential area on the northern edge of Memmingen-Amendingen. The heart of the energy concept is our local heating network for the development area with a total of 38 single-family homes. The efficient power supply concept is based on a connected and…

Dickenreishausen local heating network

A district heating network for a development area is currently under construction in the Dickenreishausen district of Memmingen. The network is supplied by an existing biogas plant with a CHP system that has a thermal output of approx. 450 kW. The waste heat supplies a development area with 25 building connections; an advance extension for…